SB2196Introduced in the Senate
POWERING UP ILLINOIS ACT
Introduced by Adriane Johnson, District 30
What does this bill do?
Plain-English breakdown
Writing a plain-English summary of this bill… this can take a few seconds the first time.
Official description
Creates the Powering Up Illinois Act. Defines terms. Sets forth findings. Requires an electric utility that operates within the State to (i) upgrade the State's electrical distribution systems as needed and in time to achieve the State's decarbonization goals, and implement federal, State, regional, and local air quality and decarbonization standards, plans, and regulations, (ii) conduct sufficient advance planning, engineering, and construction of increased distribution of system capacity by advance ordering transformers and other needed equipment so that customers can be energized without substantial delay, (iii) promptly energize new customers, including by ensuring that new housing, new businesses, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the utility to implement energization projects, (iv) promptly upgrade service when needed by customers, (v) allow customers seeking energization to choose an optional flexible connection agreement, which shall provide a tariffed, voluntary utility offering that requires customers to agree to specified service levels as a requirement of energization or interconnection through the use of demand response technology that limits the net import and export of electricity at the point of common coupling to remain within the rated capacity limits of a customer's existing service connection or distribution circuit, either on a permanent basis or to allow for immediate project operations before service or distribution system upgrades are completed, and (vi) recruit, train, and retain an adequately sized and qualified workforce to carry out the planning, engineering, and construction of electrical distribution systems needed to promptly serve customers seeking energization and service upgrades without sacrificing other necessary activities of the workforce. Sets forth provisions concerning: the staffing of an electrification team; electric utility requirements; recovery of costs; and safety standards. Effective immediately.
Where it stands
Sponsor Removed Sen. Chris Balkema
April 28, 2026
How did lawmakers vote?
No recorded vote is available for this bill yet.
What do people think?
Citizen Voice
How would you vote on this bill?
An unofficial public opinion poll. It does not affect the bill or the official vote.
One response per device. Location is self-reported and not verified. Results are informal and not a scientific survey.
Bill history
Filed with Secretary by Sen. Adriane L. Johnson
First Reading
Referred to Assignments
Added as Co-Sponsor Sen. Javier L. Cervantes
Added as Co-Sponsor Sen. Laura M. Murphy
Added as Co-Sponsor Sen. Mike Simmons
Assigned to Energy and Public Utilities
Rule 2-10 Committee Deadline Established As April 11, 2025
Added as Co-Sponsor Sen. Graciela Guzmán
Rule 2-10 Committee/3rd Reading Deadline Established As May 9, 2025
Added as Co-Sponsor Sen. Chris Balkema
Rule 2-10 Committee/3rd Reading Deadline Established As May 23, 2025
Rule 2-10 Committee/3rd Reading Deadline Established As June 1, 2025
Rule 3-9(a) / Re-referred to Assignments
Sponsor Removed Sen. Chris Balkema