← All New York bills

S03800Introduced in the Senate

Requires operators of nuclear power plants (or designee) to give notice of: scheduled releases of radioactive materials at least 24 hours before the release is planned to occur; unscheduled releases of such materials as soon as possible, but not more than 24 hours after discovery of the release; and breakdowns or malfunctions; specifies that such notice shall be given to specified parties, including to the public via a toll free number; specifies elements to be contained in the notice (i.e. the total amount of radioactivity released or planned to be released, the estimated individual dose that may occur due to the event, weather conditions at the time of release, the area affected or anticipated to be affected, the equipment that malfunctioned or the operator error or other condition that caused the release, and the corrective action taken); requires study thereof by the commissioner of health; requires preparation and distribution of a report thereupon by the commissioner of health; provides for submission of annual reports by operators of nuclear power plants; provides monetary penalties for violations.

IntroducedSenate Veterans, Homeland Security and Military Affairs

Introduced by Kevin Parker, District 21

What does this bill do?

Plain-English breakdown

Writing a plain-English summary of this bill… this can take a few seconds the first time.

Official description

Requires operators of nuclear power plants (or designee) to give notice of: scheduled releases of radioactive materials at least 24 hours before the release is planned to occur; unscheduled releases of such materials as soon as possible, but not more than 24 hours after discovery of the release; and breakdowns or malfunctions; specifies that such notice shall be given to specified parties, including to the public via a toll free number; specifies elements to be contained in the notice (i.e. the total amount of radioactivity released or planned to be released, the estimated individual dose that may occur due to the event, weather conditions at the time of release, the area affected or anticipated to be affected, the equipment that malfunctioned or the operator error or other condition that caused the release, and the corrective action taken); requires study thereof by the commissioner of health; requires preparation and distribution of a report thereupon by the commissioner of health; provides for submission of annual reports by operators of nuclear power plants; provides monetary penalties for violations.

Where it stands

REFERRED TO VETERANS, HOMELAND SECURITY AND MILITARY AFFAIRS

January 7, 2026

How did lawmakers vote?

No recorded vote is available for this bill yet.

What do people think?

Citizen Voice

How would you vote on this bill?

An unofficial public opinion poll. It does not affect the bill or the official vote.

One response per device. Location is self-reported and not verified. Results are informal and not a scientific survey.

Bill history

  1. REFERRED TO VETERANS, HOMELAND SECURITY AND MILITARY AFFAIRS

  2. REFERRED TO VETERANS, HOMELAND SECURITY AND MILITARY AFFAIRS

Verify the information

Our commitment to neutrality

We provide factual information only. We never tell you which politicians or bills to support, and we do not rank, score, or endorse anyone.